Skip to product information
1 of 18

Evo Tech

Invoxia GPS Tracker PRO - Real-Time Location - No Included Subscription - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G

Invoxia GPS Tracker PRO - Real-Time Location - No Included Subscription - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G

6 total reviews

Regular price $661.95 AUD
Regular price Sale price $661.95 AUD
Sale Sold out
Shipping calculated at checkout.
Quantity

Experience true peace of mind with the Invoxia GPS Tracker PRO. This advanced gps tracker offers precise, real-time location tracking for your valued possessions and loved ones, without the burden of ongoing subscription fees. Perfect for vehicles, bikes, or even keeping track of children's whereabouts, the Invoxia GPS Tracker PRO provides unparalleled security and convenience.

  • Real-time location tracking with pinpoint accuracy, allowing you to see the exact location of your tracked item on a map.
  • No monthly subscription required. Enjoy lifetime connectivity without recurring costs.
  • Long-lasting battery life of up to 3 months on a single charge, minimizing the need for frequent recharging. Battery life varies depending on usage.
  • Motion and tilt alerts for enhanced security. Receive instant notifications if the tracker detects unexpected movement or changes in orientation.
  • Durable and weather-resistant design, ensuring reliable performance in various environmental conditions.
  • Compact and lightweight for discreet placement. Easily conceal the tracker on vehicles, in bags, or other items.
  • Works on the reliable 4G LTE-M network, providing extensive coverage and reliable connectivity for accurate location tracking.
  • Simple setup and user-friendly mobile app. Easily configure the tracker and monitor its location through the intuitive mobile application.
  • The Invoxia GPS Tracker PRO empowers you to stay connected to what matters most. Whether you're monitoring your car's location, ensuring your child's safety on their way home from school, or protecting your valuable equipment, this gps tracker provides constant reassurance. The absence of subscription fees eliminates recurring costs, making it a cost-effective solution for long-term peace of mind. Receive instant notifications about unexpected movements or changes in position, allowing you to react swiftly to potential theft or emergencies. The long battery life ensures continuous tracking without frequent recharging.

    The tracker is constructed from durable ABS plastic and designed to withstand various weather conditions. It comes with a user manual, battery, charger, and USB cable for easy setup and charging. The compact and discreet design allows for flexible placement without drawing unwanted attention.

    Product FAQ

    Q: How does the Invoxia GPS Tracker PRO work without a subscription?

    A: The tracker utilizes a pre-paid data plan that is valid for its lifetime, eliminating the need for recurring subscription fees.

    Q: What is the battery life of the tracker?

    A: The battery can last up to 3 months on a single charge, depending on usage and frequency of location updates.

    Q: What kind of alerts does the tracker provide?

    A: The tracker sends instant alerts for motion and tilt detection, notifying you of any unauthorized movement or tampering.

    Buyer's Guide:

    Choosing the right gps tracker depends on your specific needs. The Invoxia GPS Tracker PRO is ideal for those seeking a reliable, subscription-free solution for tracking vehicles, valuable belongings, or loved ones. Its long battery life, durable design, and real-time tracking capabilities make it a versatile choice for various applications. If you prioritize accurate tracking without the hassle of ongoing fees, the Invoxia gps is the perfect solution.

    The Invoxia GPS Tracker PRO includes one tracker unit, a rechargeable lithium-ion battery, a charger, a USB cable, and a user manual. The tracker measures 10.5 x 2.7 x 9.5 cm and weighs only 30 grams.

    Frequently Asked Questions

    Does the Invoxia GPS Tracker PRO - Real-Time Location - No Included Subscription - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G include an Australian Warranty?
    Yes, all products sold by EvoTech Digital are sourced from authorized channels and include a valid Australian Manufacturer's Warranty and local support.
    How soon will my order be dispatched?
    Orders for in-stock hardware are typically dispatched from our fulfillment centers within 24-48 business hours. You will receive a tracking link via email once your item is on its way.
    Can EvoTech provide technical setup assistance for this product?
    EvoTech Digital provides complimentary Level 1 technical support. For complex enterprise setups (NAS, Networking), we offer professional managed IT services.
    Technical Reference Guide
    Model Type Invoxia GPS Tracker PRO - Real-Time Location - No Included Subscription - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G
    Auth Status Verified Australian Stock
    Support Channel EvoTech Perth Technical Support
    View full details